HEY MAKO JOE , i applied the durabak coating yesterday to my boat floor. some advice; dry time for the first coat was 3 hours second coat was 5 hours , 24 hours to walk. i followed the dirctions to a tee. cool stuff, went on easy and looks great , went with the sand color. 1 gallobn was perfect with a pint to spare. temp was 50 and humidity was 30%. any questions feel free to ask.
victore.