T-top in progress, some bracing still to be done. Rear down posts provide the proper rigidity for use on the Pacific Coast. Also provide some thing to hang on to in rough water.
Viewed: 1203 times.
|
This was taken the day I picked her up. About half way home. Note home made rocket launcher, that was the first thing to come off. Not very useful and in the way.
Viewed: 1258 times.
|
Same day , same spot. Rear 3/4 view.
Viewed: 1263 times.
|
View from bow, fish box is first hatch in floor. Ice box is under seat in front of console.
Viewed: 1463 times.
|
Yamaha multi-use gauge dash. Navman on right, hr meter on left.
Viewed: 2348 times.
|
Tank fill and flush mount vent. Tank fill is hidden by seat back when in place.
Viewed: 1641 times.
|
Windline URM-4 anchor roller. Installing anchor lock down and chain deck pipe for permanent anchor installation on bow.
Viewed: 1669 times.
|
Side access door view. Re-bundled all wiring and replaced fuse box with new plug in fuse type ( 10 gang ).
Viewed: 1421 times.
|
19 gallon Mueller fuel tank. Cost 89.00 + shipping. Fits under console with out lifting, just remove rear panel.
Viewed: 1206 times.
|