T-top in progress, some bracing still to be done. Rear down posts provide the proper rigidity for use on the Pacific Coast. Also provide some thing to hang on to in rough water.
Viewed: 1204 times.
|
This was taken the day I picked her up. About half way home. Note home made rocket launcher, that was the first thing to come off. Not very useful and in the way.
Viewed: 1259 times.
|
Same day , same spot. Rear 3/4 view.
Viewed: 1265 times.
|
View from bow, fish box is first hatch in floor. Ice box is under seat in front of console.
Viewed: 1464 times.
|
Yamaha multi-use gauge dash. Navman on right, hr meter on left.
Viewed: 2349 times.
|
Tank fill and flush mount vent. Tank fill is hidden by seat back when in place.
Viewed: 1642 times.
|
Windline URM-4 anchor roller. Installing anchor lock down and chain deck pipe for permanent anchor installation on bow.
Viewed: 1670 times.
|
Side access door view. Re-bundled all wiring and replaced fuse box with new plug in fuse type ( 10 gang ).
Viewed: 1422 times.
|
19 gallon Mueller fuel tank. Cost 89.00 + shipping. Fits under console with out lifting, just remove rear panel.
Viewed: 1207 times.
|